Manufacturer Direct Thermodynamic Laboratory

Lagged Pipe Apparatus

Available for bulk tender supply, exports & turnkey lab projects worldwide.

Bulk Supply Tender & export ready
90+ Countries Worldwide exports
24-Hour Quote Fast BOQ response

Product Description

Description: The Air Conditioning Test Rig unit is required to conduct experiments and demonstrate the process of cooling of atmospheric air. The unit will be fitted with all instruments facilities so that temperature,...โ€ฆ

Contact Us

Tender Specification Details for Bulk Supplies

Description: The Air Conditioning Test Rig unit is required to conduct experiments and demonstrate the process of cooling of atmospheric air. The unit will be fitted with all instruments facilities so that temperature, pressure etc. may be measured at different points in the air conditioning system. The setup also provide the facility to conduct the experiment of heating of air, humidification. Technical Details:
G.I. Pipe Inner                   :           5-6 cm dia. Approx.
G.I. pipe middle                 :           10-11 cm dia. Approx.
G.I. Pipe outer                   :           15-16 cm dia. Approx.
Length of Pipes                 :           100 cm Approx.
Heater                               :           Nichrome Wire
Experimentation: To estimate the actual rate of heat transfer through the composite cylinders from the measured interface temperature of the two insulating materials with known thermal conductivities. To determine the effective thermal conductivity of the composite cylinder. To compare the theoretical temperature profile within the composite cylinders, with that of observed profile.
Bulk Tender Specialists

Bulk Order of Lagged Pipe Apparatus?

Send us your tender BOQ โ€” we'll respond with a fully compliant manufacturer quote within 24 hours. Trusted by institutional & government buyers worldwide.